View raw markdown

PRISM/MVP — Product Validation Landscape Framework

Version: 1.0.0 Status: Draft Licence: CC BY-SA 4.0


1. Overview

PRISM/MVP is a framework for describing, governing, and evolving a product's validation journey as a structured, navigable landscape. It answers the question no existing product framework addresses as a coherent landscape: who are we building for, what problem are we solving, what are we betting on, what do we believe but haven't proven, and what are we actually learning?

Existing approaches each cover a subset:

Approach What it does What it misses
MVP Canvas Single-page visual: segments, value props, channels, assumptions, experiments Flat structure — no hierarchy, no validation lifecycle, no cross-referencing, no temporal arc
Lean Startup Build-measure-learn loop No structured landscape; no assumption prioritization; no connection to technical reality
OKRs Outcome-based goal setting Tells you what to achieve, not how to validate the assumptions behind the goals
User Story Mapping Visual backlog structure Output-focused (features), not outcome-focused (validation); no assumption tracking
Product Backlog (Scrum) Feature priority queue Assumes you know what to build; no room for the "is this the right thing?" question
Shape Up Bet-based six-week cycles Build-focused; no hypothesis lifecycle; no market or value modeling

PRISM/MVP is text-first, git-native, and schema-validated. It models the full product validation landscape — not just what the product does, but the organizational beliefs behind it, the experiments testing those beliefs, and the learning trajectory from hypothesis to validated product.

What makes PRISM/MVP different

Hypotheses as the unit of work. Not features, not stories, not tickets. Every capability we build is a bet on an underlying hypothesis. PRISM/MVP makes those hypotheses explicit, versioned, and validated (or invalidated) through the git history.

Learning velocity over feature throughput. The north star of PRISM/MVP is not how many features shipped — it's how fast the team is invalidating assumptions. Invalidating a risky assumption is a product success even if the feature is killed.

Bets not backlogs. PRISM/MVP replaces must/should/could as a priority scheme with investment decisions. Each bet has a rationale ("we're betting on this because..."), a linked hypothesis ("the assumption this tests is..."), and an opportunity cost ("by doing this, we're not doing..."). A bet without a rationale is a guess. A guess should not be in the landscape.

Temporal arc across the validation journey. Every hypothesis has a lifecycle: unvalidatedin-progressvalidated or invalidated. The landscape captures this arc, preserving what was learned even after invalidation. Deleted hypotheses are invisible learnings. PRISM/MVP keeps them.

Exclusions are first-class artifacts. Most product frameworks ignore what you decided NOT to build. PRISM/MVP models exclusions explicitly — with rationale. This prevents the "why didn't we build X?" conversation from happening twice.

Cross-framework integration. Bets link to PRISM/A components (what we're actually building). Market segments link to PRISM EA stakeholders (who we're building for). Signal metrics link to PRISM/A quality SLOs (measuring the right thing at the system level). PRISM/MVP is not a standalone canvas — it is part of the PRISM ecosystem.

What PRISM/MVP is not

Relationship to PRISM (Enterprise Architecture)

Concern Framework
Stakeholders, capabilities, systems, intent, signals, movement PRISM EA
Customer segments, value propositions, product bets, hypotheses, learning signals PRISM/MVP

PRISM EA's People/stakeholders lists who's involved in the enterprise. PRISM/MVP's Market dimension describes those same people through a product lens — their jobs to be done, their pain points, and how they're reached. Cross-reference PRISM EA stakeholder IDs using the prism_ea_stakeholder link field.

PRISM EA's Intent layer captures strategic goals and drivers. PRISM/MVP's Value dimension captures the product-level problem statements those goals generate. They are complementary: Intent is "why the enterprise" and Value is "why this product."

Relationship to PRISM/A (Application Architecture)

PRISM/A describes the applications being built. PRISM/MVP describes why those applications are the right bets. Bets in PRISM/MVP's Bets dimension link to PRISM/A component IDs — connecting the product decision to the technical implementation.


2. Foundational Principles

PRISM/MVP inherits three principles from PRISM EA.

2.1 YAML for Artifacts, JSON for Schemas

Product landscapes are authored in YAML. Product managers, designers, engineers, and business stakeholders all need to read and write these files without specialized tooling. YAML's comments, block scalars, and minimal syntax noise make this tractable.

2.2 Git-Native Learning (Architecture as Code)

Product architecture in PRISM/MVP is architecture as code: hypotheses and bets live in git, not a slide deck that goes stale the day after the review.

Git concept PRISM/MVP meaning
Branch Exploration of a product direction or hypothesis variant
Commit An assumption formed, tested, or concluded
Pull request Product review — PM, design, engineering, and stakeholder alignment
Tag Published learning milestone: "we know enough to proceed"
Diff Change in product understanding since last review
History Audit trail of what was believed, tested, and learned

Every invalidated hypothesis is a preserved learning. Every pivot is a pull request with a reviewer discussion. Every "why did we build this?" question is answerable from the git log.

2.3 Temporal Axis

State Meaning
baseline Current understanding — hypotheses formed, product in initial state
transition Validation in progress — experiments running, learnings accumulating
target Validated state — hypotheses confirmed or product direction set

Hypotheses declare their own validation state. An assumption under active testing is different from one that's been invalidated. The landscape tracks both — without deletion.

2.4 Jobs-to-Be-Done as the Customer Model

PRISM/MVP frames customers through what they're trying to accomplish, not just demographics. A "26–35 year old urban professional" is an incomplete customer model. "When I file a complex insurance claim, I want to understand where it stands without calling an agent, so I can plan my recovery financially" is actionable.

Every segment in PRISM/MVP includes a Jobs-to-Be-Done (JTBD) statement. Personas are optional enrichment; the JTBD is the core.

JTBD format: When [situation], I want [motivation], so I can [outcome].


3. The Five Dimensions

Dimension Question Scope
Market Who are we building for, and what is their context? Segments, personas, channels, engagement models
Value What problem are we solving, and what value do we deliver? Problem statements, value propositions, differentiators, outcomes
Bets What are we building, and what are we choosing NOT to build? Feature bets (must/should/could as investment decisions), exclusions, alternatives
Hypotheses What do we believe but haven't proven? Assumptions, risks, unknowns
Signals What are we learning? Metrics, experiments, results, learnings, pivots

Why five?

Market precedes Value because understanding who you're building for is not the same as understanding what they need. A segment is defined by context and JTBD; the value proposition is the response to that context. Conflating them produces "customer segment: people who need insurance" which is not a product insight.

Value precedes Bets because every product bet should be traceable to a problem. A bet with no linked problem is output without outcome. The Value dimension forces the "what problem does this solve?" question before any scope decision is made.

Bets are investment decisions, not a backlog. Must/should/could in PRISM/MVP are not priority tiers on a feature list — they are degrees of investment certainty. A must bet is something non-negotiable for the value proposition — cutting it invalidates the core. A should bet adds significant value but is negotiable. A could bet is an option held open pending signal. This framing prevents scope creep disguised as reprioritization.

Hypotheses stand alone because assumptions are the highest-leverage artifact in product development. Most products fail not because they shipped badly, but because they shipped the wrong thing — a consequence of untested assumptions. By making hypotheses a first-class dimension, PRISM/MVP forces assumption articulation before bets are decided, and preserves invalidated assumptions as organizational learning.

Signals are last because they synthesize the other four. A metric is only meaningful if you know which segment you're measuring, which problem you're trying to solve, which bet you're validating, and which assumption you're testing. A "north star metric" without the context of Market, Value, and Hypotheses is a number without a story.


4. Dimensions — Artifact Types

4.1 Market

Artifact type Description
segment A defined group of people or organizations with a shared context and JTBD
persona An archetype within a segment — optional enrichment with behavioral detail
channel How we reach and serve this segment: direct, partner, marketplace, product-led
engagement_model How customers interact with the product: self-serve, high-touch, community, hybrid

Key fields on market artifacts:

Field Type Description
jtbd string Jobs-to-Be-Done statement: "When [situation], I want [motivation], so I can [outcome]"
segment_type enum primary | secondary | negative — Primary: who we're optimizing for. Secondary: benefiting but not the focus. Negative: explicitly NOT building for this group
size enum large | medium | niche — qualitative market size; do not fabricate numbers
validation_state enum assumed | observed | validated — how much evidence we have for this segment
evidence string What evidence exists for this segment's existence and need
prism_ea_stakeholder string Reference to PRISM EA stakeholder ID

Segment types:

4.2 Value

Artifact type Description
problem A specific pain point, friction, or unmet need experienced by a segment
value_proposition What we deliver in response to a problem: gain creator, pain reliever, or new possibility
differentiator What makes our solution distinctive vs. alternatives a customer would otherwise use
outcome The measurable result we expect the customer to achieve when the value proposition is realized

Key fields on value artifacts:

Field Type Description
segment_id string Problems link to the segment that experiences them
value_type enum gain | pain_relief | new_possibility — which type of value does this create
evidence string What evidence exists that this problem is real and worth solving
validation_state enum assumed | observed | validated
alternative string What does the customer do today instead of using our solution
linked_problem string For value propositions: which problem does this address

Validation states on problems and value propositions:

Problems that are still assumed should be the first thing validated — before building anything.

4.3 Bets

Artifact type Description
bet A feature, capability, or design decision we're investing in — with rationale and linked hypothesis
exclusion An explicit decision NOT to include something, preserved with rationale
alternative An option considered and rejected, with the reason for rejection

Key fields on bet artifacts:

Field Type Description
tier enum must | should | could — investment certainty, not priority
rationale string Why are we making this bet? What do we believe it will achieve?
linked_hypothesis string ID of the hypothesis this bet is designed to test
linked_value string ID of the problem or value proposition this bet addresses
opportunity_cost string What are we NOT doing by making this bet?
status enum active | validated | invalidated | parked
ai_specific boolean True if this is an AI feature bet — enables AI assumption tracking
prism_a_component string Reference to PRISM/A component ID (what we're actually building)
depends_on string[] IDs of hypotheses this bet depends on

The must/should/could model in PRISM/MVP:

Unlike traditional prioritization, PRISM/MVP's tier is fixed at bet creation time and changes only when a learning or strategic decision explicitly revises it. A must bet that gets deprioritized must become an exclusion with rationale — not silently moved down a list. A could bet that receives validating signal is explicitly promoted to should or must. This creates a decision audit trail.

Bet status lifecycle:

active → validated   (bet delivered, hypothesis confirmed)
       → invalidated (hypothesis disproven; bet killed or revised)
       → parked      (deferred pending signal; not killed)

4.4 Hypotheses

Artifact type Description
assumption Something believed to be true that, if wrong, would materially change the product direction
risk The consequence if a specific assumption is invalidated
unknown A known unknown: something we know we don't know yet, but need to before deciding

Key fields on hypothesis artifacts:

Field Type Description
assumption_type enum desirability | viability | feasibility | usability | ai-behavior
risk_level enum critical | high | medium | low — how bad is it if this is wrong?
validation_state enum unvalidated | in-progress | validated | invalidated
validation_criteria string How will we know if this assumption is true? What evidence is sufficient?
linked_bet string ID of the bet this hypothesis supports
discovery_date date When this assumption was first articulated
resolution_date date When validation concluded (validated or invalidated)
linked_learning string ID of the learning that resolved this assumption

Assumption types:

Type What it tests
desirability Do customers actually want this?
viability Can we build a sustainable business on this?
feasibility Can we build this with our current capability?
usability Will customers be able to use this effectively?
ai-behavior Will the AI component perform as needed? (accuracy, trust, bias, hallucination)

Assumption prioritization: Test the riskiest (critical) and least validated (unvalidated) assumptions first. An assumption that is low risk if wrong does not need to be tested before shipping. An assumption that is critical and unvalidated is the most dangerous artifact in the landscape — it represents a product bet with no foundation.

4.5 Signals

Artifact type Description
metric A measurement used to track product health, validate hypotheses, or guide decisions
experiment A structured test designed to validate or invalidate a specific assumption
result The outcome of an experiment: what was observed, measured, and recorded
learning The interpretation of a result: what this means for the product direction
pivot A significant change in direction based on learnings

Key fields on signal artifacts:

Field Type Description
metric_type enum north_star | guardrail | diagnostic
linked_hypothesis string The assumption this experiment or metric is testing
linked_bet string The bet this signal is validating
method enum a_b_test | usability_study | survey | interview | prototype | dogfood | beta | shadow
result_state enum pending | supports | refutes | inconclusive
confidence enum high | medium | low
n integer Sample size (if applicable)
pivot_type enum For pivots: zoom-in | zoom-out | customer-segment | value | channel | platform | business-model | persist

Metric types:

The Learning Loop:

Market + Value (understanding)
       ↓
   Hypotheses (articulating beliefs)
       ↓
     Bets (investment decisions)
       ↓
   Signals (validation)
       ↓
   Learnings (interpretation)
       ↓
  Pivot / Persist (direction)
       ↓
 [update Market, Value, Hypotheses, Bets]

Each loop iteration is a version of the landscape. The git history IS the learning history.

Pivot types (adapted from Lean Startup):

Type Meaning
zoom-in What was a feature becomes the whole product
zoom-out What was the whole product becomes a feature of something bigger
customer-segment We had the right product for the wrong customer
value The problem we're solving isn't the one customers care about
channel The product is right, the distribution is wrong
platform A feature becomes a platform (or vice versa)
business-model Same value, different revenue structure
persist Learnings confirm current direction; continue as planned

5. File Structure

<org-name>/
  .prism-mvp/
    config.yaml             # landscape metadata
  market/
    landscape.yaml
  value/
    landscape.yaml
  bets/
    landscape.yaml
  hypotheses/
    landscape.yaml
  signals/
    landscape.yaml

.prism-mvp/config.yaml

prism_mvp_version: "1.0"
organization: "ACME, INC"
product: "AI Claims Triage"
description: "MVP validation landscape for AI-assisted claims triage and routing"
domain: insurance
scope: product          # enterprise | product | feature
temporal_state: transition
as_of: "2025-01-01"
active_dimensions:
  - market
  - value
  - bets
  - hypotheses
  - signals
target_segments:
  - seg-claims-adjudicators
  - seg-policyholders-claimants
learning_cadence: "2-week sprint"

Dimension landscape file structure

# hypotheses/landscape.yaml
dimension: hypotheses
as_of: "2025-01-01"
temporal_state: transition

assumptions:
  - id: hyp-adjuster-trust
    name: "Adjuster AI Trust Threshold"
    type: assumption
    assumption_type: usability
    risk_level: critical
    validation_state: in-progress
    description: >
      Claims adjusters will trust AI triage scores enough to use them as a primary
      routing signal — provided accuracy exceeds 85% on historical claims.
    validation_criteria: >
      > 70% of adjusters in pilot cohort route claims using AI score without manual
      override within 30 days of exposure. Manual override rate < 40%.
    linked_bet: bet-ai-intake-scoring
    discovery_date: "2024-11-15"

risks:
  - id: risk-trust-failure
    name: "Adjudicators Reject AI → Feature Abandoned"
    type: risk
    risk_level: critical
    linked_assumption: hyp-adjuster-trust
    mitigation: >
      SHAP explanations included in MVP. Weekly sync with pilot lead.
      Override tracking to identify patterns in rejected scores.

unknowns:
  - id: unk-workload-context
    name: "Does AI Trust Vary by Workload Level?"
    type: unknown
    planned_investigation: "Segment pilot results by daily claim volume."

6. The Learning Loop

The Learning Loop is the core operating principle of PRISM/MVP. It connects the five dimensions into a closed validation cycle.

Every experiment references a hypothesis. Every result has a confidence level. Every learning interprets a result. Every pivot or persist decision references a learning. The chain is traversable in both directions:

Learning velocity: A team running 3 experiments per sprint and invalidating 2 assumptions is moving faster than a team shipping 10 features. PRISM/MVP makes learning velocity visible: the ratio of validated | invalidated hypotheses to unvalidated hypotheses, tracked over time.

Preserving invalidated hypotheses: An invalidated assumption is not a failure — it is an asset. It tells the next product team why a direction was tried and abandoned. PRISM/MVP never deletes assumptions; invalidated ones are marked invalidated with a resolution date and linked learning.


7. Cross-Referencing

PRISM/MVP artifacts link to other PRISM framework artifacts:

# market/landscape.yaml
- id: seg-claims-adjudicators
  links:
    prism_ea_stakeholder: stk-claims-adjusters    # PRISM EA People/stakeholders

# bets/landscape.yaml
- id: bet-ai-intake-scoring
  links:
    prism_a_component: comp-claims-ai-triage      # PRISM/A Components
    prism_ea_system: sys-claims-ai                # PRISM EA Reality/systems

# signals/landscape.yaml
- id: metric-time-to-decision
  links:
    prism_a_slo: slo-claims-ai-accuracy           # PRISM/A Quality/SLOs

Cross-references are soft — no schema enforcement across frameworks. PRISM/MVP does not import other frameworks' schemas.


8. Dependency Modeling and Blast Radius

PRISM/MVP uses depends_on to model the validation chain:

# bets depend on hypotheses
- id: bet-ai-intake-scoring
  depends_on: [hyp-adjuster-trust, hyp-ai-accuracy-threshold]

# experiments depend on bets
- id: exp-adjudicator-pilot-cohort
  depends_on: [bet-ai-intake-scoring]

# learnings depend on results
- id: learn-model-accuracy-89pct
  depends_on: [result-model-backtest]

Invalidation blast radius: If a critical assumption (hyp-adjuster-trust) is invalidated, every bet that depends on it is at risk. Selecting the assumption in the landscape shows all dependent bets — the full blast radius of the invalidation.

Forward traversal: select a hypothesis → see which bets rest on it → see which experiments are testing it. Backward traversal: select a bet → see which results support or refute its foundation.


9. Validation State Lifecycle

Hypotheses follow a validation lifecycle:

unvalidated → in-progress → validated
                          └→ invalidated

Bets follow a parallel lifecycle driven by their hypothesis outcomes:

active → validated    (bet delivered, core hypothesis confirmed)
       → invalidated  (core hypothesis disproven — bet killed or fundamentally revised)
       → parked       (deferred pending signal — not killed, not advancing)
- id: hyp-adjuster-trust
  validation_state: validated
  resolution_date: "2025-03-15"
  linked_learning: learn-trust-with-explainability

- id: hyp-policyholder-self-serve
  validation_state: invalidated
  resolution_date: "2025-02-01"
  linked_learning: learn-self-serve-not-preferred-by-over-60s

Invalidated hypotheses are preserved. The linked learning explains what was found. The linked bet record explains what was decided differently.


10. AI-Native Assumption Types

PRISM/MVP recognizes that AI features carry a unique class of assumption not covered by traditional product frameworks:

AI assumption subtype What it tests
Accuracy threshold Will the model be accurate enough for users to trust it?
Trust formation Under what conditions will users override AI vs. follow it?
Bias and fairness Does the model produce equitable outcomes across user groups?
Explainability Can users understand why the AI made a specific decision?
Failure modes How does the system behave when the model is wrong? Is the failure safe?
Data availability Is training data available, labeled, and of sufficient quality?
Hallucination tolerance How much variance or confabulation will users accept?

These assumptions use assumption_type: ai-behavior and should carry risk_level: critical by default. AI feature failures are often invisible until user trust is lost — and lost trust is rarely recoverable.

- id: hyp-ai-accuracy-threshold
  assumption_type: ai-behavior
  risk_level: critical
  description: >
    Adjusters will trust AI triage recommendations if model accuracy on
    historical claims exceeds 85%. Below 85%, manual override rate exceeds
    60% and the feature does not deliver the projected time savings.
  validation_criteria: >
    Backtest model on last 6 months of labeled claims.
    Accuracy ≥ 85% = hypothesis supported.
    Run adjuster trust study with real routing data.

11. What PRISM/MVP Does Not Cover


12. Glossary

Term Definition
Bet An investment decision in a feature, capability, or design approach — with rationale, linked hypothesis, and declared opportunity cost
Hypothesis An assumption held about the market, customer, or product that, if wrong, would change product direction
JTBD Jobs-to-Be-Done: the functional or emotional goal a customer is trying to accomplish in a given situation
Learning velocity The rate at which the team is validating or invalidating hypotheses — the PRISM/MVP measure of product momentum
Pivot A structured change in product direction based on signal from experiments, with a declared pivot type and rationale
Persist A decision to continue current direction, supported by signal — the outcome when learning confirms the hypothesis
North star metric The single primary metric that captures whether the product is delivering value to its primary segment
Guardrail metric A metric that must not worsen; protects against optimizing one dimension at the cost of another
Negative segment A customer segment explicitly identified as NOT the target — prevents feature drift toward the wrong audience
Exclusion An explicit decision not to include a feature or capability, preserved in the landscape with rationale
Blast radius The set of bets that become at risk when a critical assumption is invalidated
Validation state The lifecycle state of a hypothesis: unvalidated, in-progress, validated, or invalidated
Assumption type The category of an assumption: desirability, viability, feasibility, usability, or ai-behavior

Paper

Palakurthi, V.G. (2026). PRISM: Enterprise architecture frameworks for the source-first era.